redux-framework
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/ishwaqol/public_html/wp-includes/functions.php on line 6121houzez-crm
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/ishwaqol/public_html/wp-includes/functions.php on line 6121js_composer
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/ishwaqol/public_html/wp-includes/functions.php on line 6121PEARL CONCEPT CONSTRUCTIONS
PEARL HARMONY
Presenting ‘Pearl Harmony.
Status
Under-construction
As per MahaRERA
Revised Proposed Date of Completion
31 September 2019
Structure
Ground + 7 Storey Tower
External Features of the New Edifice
Earthquake Resistant RCC Structure
Functional & Aesthetic elevation designed by a tea of experienced, professional and creative Architects
Aesthetically designed Entrance Lobby
Elevator of Omega or equivalent make shall be provided
Interlocking Paver Blocks/ Chequered tiles shall be provided in the compound area
External Sand faced plaster with 2 coats of cement/ textured as per the design and color scheme of the architect.
Internal Amenities of the Apartment
Standard make Vitrified tiles flooring for all the rooms
Anodized Aluminum Windows with M. S. Grill
Anti-skid Designer Ceramic Tiled for the bathroom flooring and 7’-0” high ado glazed Ceramic tiles for the bathroom walls
Granite Kitchen Platform with SS Sink
Dado tiles up to 2’-0” above Kitchen Otta
Teak Wood Door frames for all the door frames
Marble/ Granite door frames for bathrooms/ toilet
Decorative Main Entrance Door having laminated flush door frames for bathrooms/ toilets
Decorative Main Entrance Door having laminated flush doors with oxidized fittings.
Painted laminated flush doors for all the other internal doors
Marble/ Granite window sill for all the windows
Copper wiring with adequate electrical points with modular switches of branded make
Plumbing in C class GI pipes of CPVC pipes with fixtures of Jaquar or equivalent make
Good quality sanitary fittings of branded make
Internal wall finish shall be in gypsum with acrylic paint
EACH FLOOR 2 APARTMENTS + 1 LIFTS
2 BHK Apartment
Carpet Area 535 Sq. ft.
Door Entering into North West
Additional Charges
Development Charges, Club Membership Charges, Society Charges, Advance Maintenance, Stamp Duty, Registration Charges and GST.
All as per apartment value.
Loan can be sanctioned from any bank
Immediate Registration
Full White Agreement
Thanks & Regards!
Pankaj Ishwarlal Soni
IEC MUMBAI
9322260203
9270257499
www.ishwarestateconsultant.com